Project Details

Location: Morinville, AB

Time Frame: August 2019 – September 2019

Project Value: $580,000

Contract Type: Lump Sum

Services Rendered: Environmental & Demolition

Project Summary

The demolition, removal, and disposal of an existing retail fueling facility include the building, fuel canopy, three underground storage tanks, three fueling dispensers, and all petroleum-related infrastructure. In addition to this work, the project includes excavation and removal of impacted soils.

Project Scope

  • Complete abatement removal and disposal of building hazardous asbestos-containing materials

  • General demolition of all identified components within the project boundary, including utility disconnects, kiosk, canopy, dispenser equipment, piping, conduit, vents, signage, lights, garbage enclosure, and all above and below-grade structural concrete, and asphalt or sidewalks/curbing

  • Removal and disposal of building structures, oil water separators, piping and foundations

  • Completed all required petroleum equipment removals, including the piping, distribution lines, dispensers, oil water separator and underground storage tanks upon purging and verifying a stable interior atmosphere

  • Excavation and removal of 8,000 tons of hydrocarbon-impacted soils

  • Removal and disposal of contaminated groundwater

  • Installation of liner along property lines as per soil management plan

  • Import fill, place and compact for all below-grade excavations and site restoration