Project Details

Location: Gold Mine, Northern Ontario

Time Frame: August 2021 - July 2022

Project Value: $8,000,000

Contract Type: Unit Rate

Services Rendered: Mine Development

Project Summary

Morgan was engaged to construct a 3.7km long rock-lined filtration ditch intended to capture any dirty water and provide containment, mitigating environmental risk associated with surface runoff. In addition to the filtration ditches, the filtration network included two large ponds which assist with storage requirements and allow for dissipation.

Project Scope

Phase 1:

  • 1.8 km of road was built for light vehicles, using Zone 5 rockfill material

  • A 1.8 km long ditch was excavated and lined with Zone 5A rockfill material for protection

  • A 29,000 m3 holding pond was dug out

  • A 1800mm diameter concrete reinforced manhole was installed

  • A 600mm HDPE intake pipe was installed

  • Water was properly managed during excavation activities

  • Phase 1 work activities were completed ahead of schedule

Phase 2:

  • Built a 1.9 km road for light vehicles using Zone 5 rockfill material

  • Dug and armored 1.9 km of ditches using Zone 5A rockfill material

  • Excavated a 36,000 m3 holding pond

  • Installed a 1800mm diameter concrete reinforced manhole

  • Installed a 600mm HDPE intake pipe

  • Managed water during excavation activities