Project Details
Location: Fort McMurray, AB
Time Frame: June 2021 – September 2021
Project Value: $800,000
Contract Type: Lump Sum
Services Rendered: Environmental & Demolition
Project Summary
Abatement and demolition of plant included in our service offering was the processing and brokering of the recycled steel. Morgan provided a transparent sales and recycling program to the client in order to sell equipment as assets and to scrap and process the equipment that had no residual retail value. The result was a near “net zero” cost to the client for the demolition activities.
Project Scope
Recycled more than 1,700 tons of scrap steel and 400 tons of concrete
Transported 400 tons of construction and demolition waste to the landfill
Removed a total of 581 steel piles
Successfully salvaged several MCC buildings, a gas turbine, and various pumps during the demolition process
Sorted and processed the scrap materials, resulting in a $320,000 credit for the client