Project Details

Location: Riverfront Park, Fort McMurray, AB

Time Frame: July 2019 – November 2019

Project Value: $2,800,000

Contract Type: Lump Sum / Time & Materials

Services Rendered: Environmental & Demolition

Project Summary

Site remediation of a former industrial area of downtown Fort MacMurray, AB as well as construction of a new recreational walking path connecting the downtown core to the MacDonald Island recreational area. Morgan utilized our civil construction and environmental remediation skillsets to complete all scopes of work in house. A “turnkey” service to the city maximizing efficiency and minimizing cost.

Project Scope

  • Excavate 5400 m3 of soil that have been contaminated by PAH, transport and dispose of safely

  • Repair a trail that's almost 3 kilometers long

    • Remove bushes and trees, path realignment, install a base layer of gravel, and cover with pavement

    • Install new dirt and grass along the trail

  • Cover an area of 10,500 m2 with geotextile

  • Create a path made of asphalt, 3 meters wide, and 2.6 kilometers long

  • Build a retaining wall 35 meters long to keep the path from sliding downhill

  • Install seven culverts 5 meters long to help water flow under the path

  • Use 54 screw piles to install solar lights along the path