Project Details

Location: Fort McMurray, AB

Time Frame: 2019 - 2020

Project Value: $46,000,000

Contract Type: Unit Rate

Services Rendered: Mine Development

Project Summary

To facilitate the development of a new oilsands mine our client trusted Morgan with the construction of 10km of access road. Included in this project was the construction of five major water crossings, two of which were large-diameter steel culverts and three concrete bridge structures on steel-driven piles. In addition to the 10km of high-grade road, Morgan was also tasked with the construction of a permanent laydown area that will serve as the construction management team’s office location and material storage throughout the development of the new mine.

Project Scope

  • Built and maintained 10 km of temporary access ice roads

  • Removed muskeg, topsoil, and subsoils from road and ditching areas

  • Constructed a permanent 10.3 km West Access Road

  • Built five major water crossings, including three permanent bridge decks and two large culvert crossings

  • Constructed around 75 minor water crossings

  • Built a laydown area

PROJECT QUANTITIES

The estimated quantities for the scope of work are as follows:

  • Removed 43,424 m3 of topsoil and cut peat for West Access Road

  • Removed 31,806 m3 of topsoil and cut peat for borrow pits

  • Excavated 28,379 m3 of common material suitable for road construction

  • Excavated 28,380 m3 of common material unsuitable for road construction

  • Filled with 23,649 m3 of suitable common excavation material

  • Used 122,511 m3 of borrow fill

  • Excavated 147,007 m3 of borrow material

  • Excavated 113,354 m3 of unsuitable material from borrow pits

  • Used 37,370 m3 of gravel for WAR base course

  • Installed 675 lm of culverts

  • Used 55,277 m3 of erosion control blankets (SC150)

  • Used 201,733 m2 of non-woven geotextile

  • Used 201,733 m2 of biaxial geo-grid

  • Prepared 131,985 m3 of subgrade

  • Drove 46 bridge piles for a total of 855 lm

  • Drove 58 wingwall piles for a total of 802 lm

  • Installed 3 pre-cast concrete bridge decks with steel superstructure

  • Built and maintained 10 km of ice road

  • Constructed 5 temporary ice road crossings

Projects

Our innovative mining portfolio

Our proven track record of success in the mining sector is what separates Morgan from the rest of the market. Take a look at some of our recent milestone projects.

Mine Development

Overburden Ditching and Ponds

Morgan was engaged to construct a 3.7 km long rock-lined filtration ditch intended to capture any dirty water and provide containment, mitigating environmental risk associated with surface runoff. In addition to the filtration ditches, the filtration network included two large ponds which assist with storage requirements and allow for dissipation.

Read More

Oil & Gas Construction
Mine Development

TA9 Engineered Pond Bottom Cleanup

As our client progresses their mining operation, they intend to utilize a portion of the pit to store tailings which requires the installation of an engineered, competent base. A key component of this work is removing slop and unsuitable material from the existing ground that is left over from the previous mining operation.

Read More

Mine Development

Faro Rose Creek Dyke Raise

The Rose Creek Dyke Raise project is a component of the Yukon Faro Mine Remediation Project that involved the reclamation of an abandoned lead and zinc mine located 15 km north of the Town of Faro, Yukon Territory. This project included upgrading dams to ensure tailings stay in place, re-sloping waste rock piles, installing engineered soil covers over the tailings and waste rock, upgrading stream diversions, upgrading the contaminated water collection and treatment system.

Read More

Mine Development

Mackenzie Redcap Expansion - Soil Salvage and Culverts

Morgan salvaged 900,000 m3 of surface soil in advance of the construction of the Mackenzie Recap Expansion haul road. The project’s right of way crossed through multiple environmentally sensitive areas that required extensive dewatering efforts. Morgan developed location-specific dewatering plans to successfully move and treat the groundwater, reducing the risk of siltation prior to salvaging the surface soils.

Read More

Oil & Gas Construction
Mine Development

North Mine Advance – Reclamation Material Salvage

As part of Mildred Lake operations reclamation scope Morgan has been trusted to remove and salvage all surface soils and subsoils in advance of mining operations for the 2021 and 2022 reclamation seasons. Reclamation salvage is critical to our client’s operations as the surface soils must be stockpiled and stored to be reused at the end of the mine life. Morgan has successfully and safely removed and salvaged over 7.5 million m3 of soil during these two seasons resulting in a long-standing partnership.

Read More

Mine Development

Mildred Lake Extension - West Access Road

To facilitate the development of a new oilsands mine our client trusted Morgan with the construction of 10 km of access road. Included in this project was the construction of five major water crossings, two of which were large-diameter steel culverts and three concrete bridge structures on steel-driven piles. In addition to the 10 km of high-grade road, Morgan was also tasked with the construction of a permanent laydown area that will serve as the construction management team’s office location and material storage throughout the development of the new mine.

Read More