Location: Medicine Hat, AB
Time Frame: June 2022 – July 2022
Project Value: $460,000
Contract Type: Lump Sum
Services Rendered: Environmental & Demolition
Project Summary
The demolition, removal, and disposal of an existing retail fuelling facility include the building, fuel canopy, three underground storage tanks, fuelling dispensers, and all petroleum-related infrastructure. In addition to this work, the project included excavation and removal of impacted soils.
Project Scope
Completely demolished all identified components within the project boundary, including:
Utilities, kiosk, canopy, dispenser equipment, underground storage tanks, piping, conduit, vents, signage, lights, garbage enclosure, and both above and below-ground concrete structures, as well as asphalt or sidewalks/curbing
Excavated and removed 3,000 tons of soil contaminated with hydrocarbons
Removed and properly disposed of groundwater contaminated with pollutants
Imported, placed, and compacted replacement fill material to restore and fill all excavated areas below ground level
Covered the excavation site with a layer of asphalt for site restoration