Project Details
Location: Hinton, AB
Time Frame: April 2019 – August 2019
Project Value: $2,500,000
Contract Type: Unit Rate
Services Rendered: Mine Development
Project Summary
Morgan salvaged 900,000 m3 of surface soil in advance of the construction of the Mackenzie Recap Expansion haul road. The project’s right of way crossed through multiple environmentally sensitive areas that required extensive dewatering efforts. Morgan developed location-specific dewatering plans to successfully move and treat the groundwater, reducing the risk of siltation prior to salvaging the surface soils.
Project Scope
Collect approximately 900,000 m3 of soil for making roads, managing water, and filling up the Redcap dump
Create rows of topsoil and woody debris along the path where the work will be done
Build the necessary roads for transportation
Put in the culverts and bedding provided by the owner
Manage the water flow in the area
Set up two temporary bridges for construction purposes
Install pumps (10” pumps) to divert water from the creek and create a pond for collecting sediment
Environmental and water quality monitoring
Installation of synthetic slope stabilization and erosion control products