Site earthworks of CPF, 10 km high grade road, 5 wellpads, ponds, camp and equipment laydown.
157ha of site clearing and grubbing
Stripping of topsoil and subsoil to on-site stockpiles 530,000m3
Supply and placement of roadway, wellpad and CPF gravels including sub base and base gravels
Supply and installation of drainage CSP culverts and ditch construction
Excavation and embankment construction for storm ponds including the supply and installation of clay liners
Excavation, gravel placement and drainage for tank foundations including geotextiles
Completion of work including GPS survey layout and machine grade control
Erosion Control including rock check dams, matting and installed manufactured ditch blocks
Replaced topsoil and seeding
Challenges and Achievements:
Despite the continuous design changes, negotiations and partnering discussions with client, difficult winter conditions (higher than normal snowfall), and water issues; we completed and profited from this complex project with safety and quality at the top of our priority list, to the satisfaction of our client.