Location: Hardisty, AB
Time Frame: April 2020 – October 2020
Project Value: $19,500,000
Contract Type: Unit Rate
Services Rendered: Oil and Gas Construction
Project Summary
Civil site earthworks included supplying all equipment, labour, materials, and subcontractors to complete the earthworks site development and secondary containment of the midstream tank farm. Common excavation to fill, grading, construction of site access roads, approaches, culvert and ditching for site drainage, pond construction, berm construction, and four various-sized tank base foundations.
Project Scope
Excavated and moved 260,000 m3 of soil for various purposes like foundation preparation, road grading, creating berms, and stockpiling
Conducted precise excavation and final leveling of the site
Tank base preparation
Supplied and installed liners and geo-textiles for containment
Installed a leak detection system for the foundations
Supplied and placed gravel for tank pads
Constructed reinforced concrete walls for tank foundations, firewater vaults, and pump pads
Performed fine grading of a sand base layer for tank wall construction
Installed HDPE liners covering an area of 50,000 m2
Installed a Teflon liner over an area of 950 square meters
Supplied and installed geotextiles and geogrid materials over an area of 100,000 m2
Placed gravel cover over the HDPE tank containment liner
Supplied and placed gravel for roadways, including using geogrid and base gravels
Installed a total of 90,000 tons of gravel for the project
Constructed an HDPE-lined firewater pond
Installed a deep underground firewater system with pressure indicator valves (PIVs), hydrants, and performed hydro testing upon completion
Completed work, including layout surveys using GPS and machine grade control
Supplied and installed drainage culverts made of corrugated steel pipes (CSP), constructed ditches, and protected them with rip-rap armor
Conducted surveying activities and performed quality control material testing
Projects
Our historic oil and gas profile
Our historic track record of success in the oil and gas sector is what separates Morgan from the rest of the market. Take a look at some of our recent milestone projects.
TA9 Engineered Pond Bottom Cleanup
As our client progresses their mining operation, they intend to utilize a portion of the pit to store tailings which requires the installation of an engineered, competent base. A key component of this work is removing slop and unsuitable material from the existing ground that is left over from the previous mining operation.
Read More
Mustang Haul Road
Read More
Cold Lake Nabiye and Projects
Read More
North Mine Advance – Reclamation Material Salvage
As part of Mildred Lake operations reclamation scope Morgan has been trusted to remove and salvage all surface soils and subsoils in advance of mining operations for the 2021 and 2022 reclamation seasons. Reclamation salvage is critical to our client’s operations as the surface soils must be stockpiled and stored to be reused at the end of the mine life. Morgan has successfully and safely removed and salvaged over 7.5 million m3 of soil during these two seasons resulting in a long-standing partnership.
Read More
Mildred Lake Extension - West Access Road
To facilitate the development of a new oilsands mine our client trusted Morgan with the construction of 10 km of access road. Included in this project was the construction of five major water crossings, two of which were large-diameter steel culverts and three concrete bridge structures on steel-driven piles. In addition to the 10 km of high-grade road, Morgan was also tasked with the construction of a permanent laydown area that will serve as the construction management team’s office location and material storage throughout the development of the new mine.
Read More
Hardisty DRU Project
Read More